Our team handled the full strip-out that completely transformed an existing floor, navigated some lift sizing challenges (carried things upstairs like it's the 1800s 💪), and delivered a large Corian reception desk that's basically one continuous piece - just this smooth flowing surface that wraps the entire reception area.
Our team stripped the floor back to bare bones, then rebuilt it with purpose. Four new teaching spaces with acoustically treated dividing walls, so sound stays where it should. New library, breakout area, reception. Full AV system that makes remote learning seamless. And feature lighting throughout that pulls it all together.
The real test? These students will sit in these classrooms, study in this library, collaborate in this breakout space. They may not think about the construction behind it all - and that’s exactly the point. When construction is done right, it’s felt in how the space works, and remembered for how it looks and feels.
What makes an education space truly work? 👇
#nextgenerationconstruction #loveconstruction #educationfitout #buildingbeyondtoday








